LOBBY

GATEWAY'S $20M CAPITAL PROJECTS

2013
C0-GENERATION SYSTEM
$10,000,000
2014
NEW ROOF
$1,000,000
2015
ELEVATOR MODERNIZATION
$900,000
2019
LOBBY RENOVATION
$6,000,000
2020
GARAGE RENOVATION
$2,000,000
entrance
lobby
lobby
cafeteria

SUBURBAN ACCESSIBILITY WITH URBAN SOPHISTICATION


LEED SILVER
OFFICE TOWER

35 MINUTE EXPRESS TRAIN TO
NYC’S GRAND CENTRAL STATION

FIVE-STAR RESTAURANTS
AND HOTELS

BRAND NAME SHOPPING
AND FITNESS

FORTUNE 500
CORPORATE NEIGHBORS

SUBURBAN DENSITY WITH
URBAN SOPHISTICATION

OVER 3,000 NEW
APARTMENTS APPROVED

TECH SPECS

BUILT
1984
LOBBY RENOVATION
2019
CONSTRUCTION
POST TENSION CONCRETE SLABS
TYPICAL FLOOR SIZE
+/- 33,500 RSF
BUILDING SIZE
541,301 RSF
FLOORS
17 FLOORS
FLOOR LOAD
80 LBS. SF LIVE LOAD (INTERIOR)
50 LBS. SF (PERIMETER)
CEILING HEIGHT
SLAB-TO-SLAB: 11'6"
SLAB TO FINISHED CEILING: 8'2" – 8'6"
APPROX. 40" PLENUM ABOVE FINISHED CEILING
REDUNDANT POWER
3 SEPARATE FEEDERS WITH AUTOMATIC TRANSFER SWITCH (ATS)
ELECTRIC
6.0 WATTS PER RSF FOR TENANT
EMERGENCY POWER
LIFE SAFETY : DIESEL GENERATOR
DISASTER RECOVERY
(CO-GEN)
CATERPILLAR NATURAL GAS RECIPRICATING ENGINE GENERATOR RATED AT 2,055 KW
COLUMN SPACING
29' 1" X 30'
IT PROVIDERS
VERIZON FIOS, AT&T, LEVEL 3 COMMUNICATIONS, COGENT, ZAYO, CABLEVISION
MULLION DISTANCE
5' ON CENTER
LOADING AREA
2 LOADING DOCK ENTRANCES W/ 3 TRUCK BAYS AND 1 LIFT PLATFORM
HEIGHT OF FREIGHT ELEVATOR
9.5’ X 8.5’ X 5.5’
DOOR OPENING -48” (4’)
PARKING RATIO
2 PER 1,000 IN BUILDING GARAGE
MUNICIPAL LOTS NEARBY
AMENITIES
FULL SERVICE CAFETERIA
CONFERENCE FACILITY
STORAGE SPACE
16,303 SF LOCATED IN THE BASEMENT WITH FREIGHT
ELEVATOR ACCESS, 15’ 6”
SLAB TO SLAB HEIGHT
CONFERENCE FACILITY
SPRINKLER SYSTEM
100% SPRINKLER COVERAGE
SECURITY
24 X 7 ON-SITE SECURITY, 46 CAMERAS COVERING THE GARAGE AND THE BUILDING LOBBY/ PERIMETER