CONSTRUCTION
POST TENSION CONCRETE SLABS
TYPICAL FLOOR SIZE
+/- 33,500 RSF
BUILDING SIZE
541,301 RSF
FLOOR LOAD
80 LBS. SF LIVE LOAD (INTERIOR)
50 LBS. SF (PERIMETER)
CEILING HEIGHT
SLAB-TO-SLAB: 11'6"
SLAB TO FINISHED CEILING: 8'2" – 8'6"
APPROX. 40" PLENUM ABOVE FINISHED CEILING
REDUNDANT POWER
3 SEPARATE FEEDERS WITH AUTOMATIC TRANSFER SWITCH (ATS)
ELECTRIC
6.0 WATTS PER RSF FOR TENANT
EMERGENCY POWER
LIFE SAFETY : DIESEL GENERATOR
DISASTER RECOVERY
(CO-GEN)
CATERPILLAR NATURAL GAS RECIPRICATING ENGINE GENERATOR RATED AT 2,055 KW
COLUMN SPACING
29' 1" X 30'
IT PROVIDERS
VERIZON FIOS, AT&T,
LEVEL 3 COMMUNICATIONS,
COGENT, ZAYO, CABLEVISION
MULLION DISTANCE
5' ON CENTER
LOADING AREA
2 LOADING DOCK ENTRANCES W/ 3 TRUCK BAYS AND 1 LIFT PLATFORM
HEIGHT OF FREIGHT ELEVATOR
9.5’ X 8.5’ X 5.5’
DOOR OPENING -48” (4’)
PARKING RATIO
2 PER 1,000 IN BUILDING GARAGE
MUNICIPAL LOTS NEARBY
AMENITIES
FULL SERVICE CAFETERIA
CONFERENCE FACILITY
STORAGE SPACE
16,303 SF LOCATED IN THE BASEMENT WITH FREIGHT
ELEVATOR ACCESS, 15’ 6”
SLAB TO SLAB HEIGHT
CONFERENCE FACILITY
SPRINKLER SYSTEM
100% SPRINKLER COVERAGE
SECURITY
24 X 7 ON-SITE SECURITY,
46 CAMERAS COVERING THE
GARAGE AND THE BUILDING
LOBBY/ PERIMETER